Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Bahrain Grand Prix: Rosberg takes pole for Mercedes

Sat, 20 Apr 2013

So much for the 2013 Mercedes being uncompetitive. Nico Rosberg put in a strong performance in Bahrain in qualifying for tomorrow’s F1 race, beating Sebastian Vettel in to second place and Fernando Alonso in to third. But whether this was a qualifying ‘special’ from Mercedes we won’t really know until tomorrow.

2012 Mercedes SL Spied

Fri, 31 Dec 2010

2012 Mercedes SL caught testing When the fifth generation Mercedes SL hit the headlines back in 2002 it was a revelation, offering as it did the best of a coupe and a convertible and a completely bonkers performance version in the SL55. But eight years is a long time in the life of a car – even with a cosmetic facelift in 2008 – and the SL has lost its way as the flagship of the Mercedes range. More powerful cars like the SLS have put the SL in to the shadows, and even its little brother – the Mercedes SLK – is probably more desirable.

Ford Design Center set to expand

Wed, 13 Apr 2011

Symbolic of the importance it plays in Ford's small car strategy, the automakers Design Center in Cologne, Germany, is about to receive a €11.6m redevelopment. Construction is already underway on the facility's new wing, which will include design studios and 100 workplaces. The 3,000 square-meter extension is set to be completed by the end of the year.